7-11 Update

Building 5- Punch work continues throughout

Building 4- The plumber was onsite in the first unit of this building installing fixtures. All units have been painted as well.

Building 3- Corner metal trim has been installed for drywall in the last unit. The second to last unit has received mud and tape and the first two units are being textured.

Building 2- Crews are further along with electrical work and HVAC is in. They are also stocking insulation.

Building 1- Rough MEPĀ  has been installed along with HVAC.

 

Site work continues throughout. Crews were onsite preparing the South alley to be poured and everything is set up for the additional walkways and stairs to be poured.